[9/8/18] Woodin Bridge Closure

Posted in TransportationTagged

The Woodin Avenue Bridge will be closed from 7 am Monday to 8 am Friday as crews start removing the asphalt from the surface of the bridge.  Work will also include mobilizing more equipment and materials, surveying, installing water main pipe supports under the bridge, and removing the existing lamp posts.

Pedestrian access will remain open during that time.